The group has taken component in the making and revising of ISO/TC100 international chain standard a number of a long time in success and hosted the sixteenth ISO/TC100 Worldwide yearly conference in 2004.
Resources |
one. metallic:Aluminum/Steel/Alloy metal/Stainless metal/Brass,copper,bronze and so on. 2. plastic: Abdominal muscles,POM,PE,PP,PVC,Pc,PMMA,Teflon,nylon and many others. 3. other folks: carbon fiber, glass,fiberglass, wooden, hard rubber and so forth. |
Shade |
Silver, Gray, Black ,Gold or as client’s necessity |
Surface area Roughness |
Ra0.eight ( without polishing or grinding) |
Emblem Technique |
laser engraving, CNC engraving, display screen-printing and so on. |
Floor Finish |
Anodize sprucing zinc/nickel/chrome/gold plating, sand blasting, ect. |
Tolerance |
+/- .01–.05mm / can also be customized |
Certification |
ISO SEPG |
Processing equipments |
CNC machining center,NC lathe, Grinding machine, Computerized lathe equipment, Conventional lathe machineThe organization masking 88,000 sq. meters, has sophisticated products and strong specialized strength, these kinds of as the numerical management equipment resources and machining facilities, CAD/CAM program, industrial robot etc. ,Milling machine,Drilling machine,EDM,Wire-cutting equipment,CNC bending device and so on |
Testing machine |
Coordinate measuring equipment,Picture measuring instrument,Caliper and so forth |
Application |
Health care Devices/Electronic/ Industrial// Automation / motorcycle/3D printer |
Services |
OEM,ODM or as client’s prerequisite |
Packaging & Delivery
Packaging Information
one. internal packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag and so on.
2. outer packaging: carton box, wood case, plate and so forth.
3. as per customers’ necessity
Port
xiamen, or as client’s prerequisite
Direct Time :
Quantity(Items) | 1 – 20 | 21 – 100 | one hundred and one – 1000 | >1000 |
Est. Time(days) | 5 | ten | twenty five | To be negotiated |
Trade Terms | FOB, CIF, EXW |
MOQ | 1Pcs |
Port | xiamen, or as client’s need |
Delivery | By air (DHL,UPS,Fedex,EMS and many others.),By Sea,Categorical… |
Payment Technique | T/T(financial institution transfer),L/C,paypal,western union, moneygram,escrow, funds and many others |
Payment Terms | 50% before manufacturing, fifty% before shipping |
Packing | internal box,several packing containers/learn carton or as customer’s prerequisite |
Shipping time | 5-7days for Alanple time,5-twenty five days for generation |